Delay and Plan B Planner
Plan A vs. Plan B side by side, a new end time, and who is affected
Your show day, and the delay
Set up your day the same way as the Show-Day Schedule Calculator, then describe the delay.
The delay
Plan A vs. Plan B
Plan A
11:24 AM
Plan B
11:39 AM
Plan B ends 15 min later than Plan A.
Affected: performers 7, 8, 9, 10, 11, 12.
| Who | Plan A | Plan B |
|---|---|---|
| Performer 1 | 9:00 AM | 9:00 AM |
| Performer 2 | 9:11 AM | 9:11 AM |
| Performer 3 | 9:22 AM | 9:22 AM |
| Performer 4 | 9:33 AM | 9:33 AM |
| Performer 5 | 9:44 AM | 9:44 AM |
| Performer 6 | 9:55 AM | 9:55 AM |
| Performer 7 | 10:21 AM | 10:46 AM |
| Performer 8 | 10:32 AM | 10:55 AM |
| Performer 9 | 10:43 AM | 11:04 AM |
| Performer 10 | 10:54 AM | 11:13 AM |
| Performer 11 | 11:05 AM | 11:22 AM |
| Performer 12 | 11:16 AM | 11:31 AM |
The formula: the delay is added right before the chosen performer, so everyone from there on shifts later by the same amount, minus whatever the mitigations recover.
Like what you see? PeekTheFlow runs your whole show day like this, live.
About this tool
Starting from a show-day schedule, add a delay at any point in the day and see what it does to the rest of the schedule -- then try shrinking gaps, dropping a break, or cutting performers at curfew, and see the new end time and who is affected.
How to use it
- 1Start from a schedule. Build or paste in a show-day schedule.
- 2Add a delay. Pick the performer where a delay starts, and how many minutes.
- 3Try mitigations. Try shrinking changeover gaps, dropping a break, or cutting performers at curfew.
- 4Compare Plan A and Plan B. See both end times and a performer-by-performer table of exactly who moved.
A worked example
Inputs: The same 20-performer, 8:00 AM schedule as the Show-Day Schedule Calculator example (ends 11:33 AM); A 20-minute delay added before performer 12; Shrink changeover gaps turned on.
Result: Plan A ends at 11:33 AM. With the delay and shrunk gaps, Plan B ends at 11:45 AM — the 20-minute delay, minus 8 minutes recovered by halving the changeover gap for the remaining performers.
Questions
It is added right before the performer you choose. Everyone scheduled after that performer shifts later by the same amount, unless a mitigation recovers some of it.